
Phases
The top four stories were deconstructed from the NHERI TallWood ten-story specimen for the NHERI Converging Design six-story test specimen.
The first phase of testing will feature U-shaped flexural plates (UFPs) as energy dissipators bounding post-tensioned mass timber rocking walls to serve as the lateral force-resisting system.
The second phase of testing will feature buckling-restrained braces (BRBs) as energy dissipators at the base of post-tensioned mass timber rocking walls to serve as the lateral force-resisting system.
The third phase of testing will feature yield link brace connection from Simpson Strong-Tie in exploration of hybrid steel mass timber structural system solutions.